THE TOWN PLACED A $24,000 LIEN ON PLAINTIFF’S PROPERTY FOR REPAIR WORK DONE BY THE TOWN BEFORE THE PROPERTY WAS TRANSFERRED TO PLAINTIFF; PLAINTIFF BROUGHT A PROCEDURAL-DUE-PROCESS ACTION AGAINST THE TOWN (42 USC 1983); THE ACTION FAILED BECAUSE OF THE AVAILABILITY OF A CPLR ARTICLE 78 PROCEEDING (SECOND DEPT).
The Second Department, reversing Supreme Court, determined the town was entitled to summary judgment dismissing plaintiff’s 42 USC 1983 action alleging a violation of procedural due process. Plaintiff, after purchasing the property, was assessed over $24,000 for repairs to the property paid for by the town and necessitated by the prior owner’s failure to maintain the property. The procedural due process claim failed because plaintiff had the option of bringing an Article 78 proceeding:
“Procedural due process imposes constraints on governmental decisions which deprive individuals of ‘liberty’ or ‘property’ interests within the meaning of the Due Process Clause of the Fifth or Fourteenth Amendment” … . “‘Due process is flexible and calls for such procedural protections as the particular situation demands'” … . In determining what due process requires in a specific context, courts consider “(1) the private interest that will be affected by the official action; (2) the risk of an erroneous deprivation of such interest through the procedures used, and the probable value, if any, of additional or substitute procedural safeguards; and (3) the government’s interest, including the function involved and the fiscal and administrative burdens that the additional or substitute procedural requirement would entail” … .
Here, although the plaintiff’s property interest was affected by the special assessment and lien, the risk of erroneous deprivation was remedied by the availability of a proceeding pursuant to CPLR article 78 … . Accordingly, the Town demonstrated, prima facie, that it did not deprive the plaintiff of due process … . First Sovereign Equity Group, Inc. v Town of Smithtown, 2026 NY Slip Op 04928, Second Dept 8-12-26
Practice Point: Here the risk of erroneous deprivation of plaintiff’s property by the town was remedied by the availability of a CPLR article 78 proceeding. Therefore the criteria for a viable procedural-due-process action against the town were not met.

Leave a Reply
Want to join the discussion?Feel free to contribute!