You are here: Home1 / Civil Procedure2 / PORTIONS OF DEFENDANT’S MOTION FOR SUMMARY JUDGMENT PROPERLY DENIED...
Civil Procedure, Judges, Labor Law-Construction Law, Negligence

PORTIONS OF DEFENDANT’S MOTION FOR SUMMARY JUDGMENT PROPERLY DENIED AS UNTIMELY; THE PORTION OF THE UNTIMELY MOTION WHICH HAD BEEN TIMELY RAISED BY ANOTHER DEFENDANT WAS PROPERLY CONSIDERED; THE LABOR LAW 241(6) CAUSE OF ACTION PROPERLY RELIED ON INDUSTRIAL CODE PROVISIONS REQUIRING THAT ELECTRICAL POWER BE SHUT DOWN TO PROTECT ELECTRICAL WORKERS (SECOND DEPT).

The Second Department, reversing Supreme Court in this Labor Law 241(6, 200 and common law negligence action, determined; (1) portions of a defendant’s summary judgment motion brought more than a month after the ordered deadline where properly dismissed as untimely; (2) the aspect of the untimely summary judgment motion which had been timely raised in another defendant’s summary judgment motion was properly considered; (3) the industrial code requires shutting down the electricity when worker’s are doing electrical work, therefore plaintiff’s Labor Law 241(6) cause of action should not have been dismissed. Plaintiff was in an aerial bucket working on electrical lines when injured in an explosion:

Absent a “satisfactory explanation for the untimeliness,” constituting good cause for the delay, an untimely summary judgment motion must be denied without consideration of the merits … . However, “[a]n untimely motion or cross motion for summary judgment may be considered by the court where a timely motion was made on nearly identical grounds” … . * * *

… [T]he defendants … failed to establish their prima facie entitlement to judgment as a matter of law dismissing the cause of action alleging a violation of Labor Law § 241(6), which was predicated on 12 NYCRR 23-1.13(b)(3) and (4). 12 NYCRR 23-1.13(b)(3) provides, among other things, that where the performance of the work may bring any person into physical or electrical contact with an electric power circuit, the employer “shall advise his [or her] employees of the locations of such lines, the hazards involved and the protective measures to be taken.” 12 NYCRR 23-1.13(b)(4) requires, in pertinent part, that employees who may come into contact with an electric power circuit be protected against electric shock “by de-energizing the circuit and grounding it or by guarding such circuit by effective insulation or other means” … . These regulations, which refer to the duty of employers, also impose a duty upon owners … . Wittenberg v Long Is. Power Auth., 2024 NY Slip Op 01329

Practice Point: A summary judgment motion brought a month after the ordered deadline may be dismissed as untimely.

Practice Point: A portion of an untimely summary judgment motion which was timely raised by another defendant may be considered.

Practice Point: The industrial code provisions requiring that electrical power be shut down to protect electrical workers supported plaintiff’s Labor Law 241(6) cause of action.

 

March 13, 2024
Tags: Second Department
Share this entry
  • Share on WhatsApp
https://www.newyorkappellatedigest.com/wp-content/uploads/2018/03/NYAppelateLogo-White-1.png 0 0 Bruce Freeman https://www.newyorkappellatedigest.com/wp-content/uploads/2018/03/NYAppelateLogo-White-1.png Bruce Freeman2024-03-13 11:34:572024-03-16 12:05:11PORTIONS OF DEFENDANT’S MOTION FOR SUMMARY JUDGMENT PROPERLY DENIED AS UNTIMELY; THE PORTION OF THE UNTIMELY MOTION WHICH HAD BEEN TIMELY RAISED BY ANOTHER DEFENDANT WAS PROPERLY CONSIDERED; THE LABOR LAW 241(6) CAUSE OF ACTION PROPERLY RELIED ON INDUSTRIAL CODE PROVISIONS REQUIRING THAT ELECTRICAL POWER BE SHUT DOWN TO PROTECT ELECTRICAL WORKERS (SECOND DEPT).
You might also like
Question of Fact Whether County Had Constructive Notice of Pothole Which Injured Bicyclist
ABUTTING PROPERTY OWNER ENTITLED TO SUMMARY JUDGMENT IN THIS SIDEWALK SLIP AND FALL CASE, ALTHOUGH THE LOCAL CODE REQUIRED THE PROPERTY OWNER TO KEEP SIDEWALKS IN GOOD REPAIR, IT DID NOT IMPOSE TORT LIABILITY ON THE PROPERTY OWNER (SECOND DEPT).
THE DISMISSAL OF A FORELCOSURE ACTION ON THE GROUND THE BANK FAILED TO COMPLY WITH THE NOTICE OF DEFAULT PROVISIONS IN RPAPL 1304 IS NOT AN EXPRESS JUDICIAL DETERMINATION THAT THE ACTION DID NOT VALIDLY ACCELERATE THE DEBT; THEREFORE, HERE, THE 2013 FORECLOSURE ACTION IS TIME-BARRED PURSUANT TO THE FORECLOSURE ABUSE PREVENTION ACT (FAPA) (SECOND DEPT).
MOTION TO DISCONTINUE THIS REAL PROPERTY TAX ASSESSMENT CHALLENGE PROPERLY DENIED, CRITERIA EXPLAINED, SUA SPONTE MERGER OF PARCELS, RELIEF NOT REQUESTED BY THE PARTIES, WAS AN ABUSE OF DISCRETION (SECOND DEPT).
Late Notice of Claim Can Be Allowed Even in Absence of Reasonable Excuse Where Defendants Had Actual Notice
Criteria for Avoiding Dismissal After Failure to Comply with 90-Day Notice to Serve and File Note of Issue Explained
NO SUPERVISORY CONTROL OVER THE MANNER OF PLAINTIFF’S WORK, INJURY WAS NOT THE RESULT OF THE ABSENCE OR FAILURE OF A SAFETY DEVICE, LABOR LAW 200 AND 240 (1) CAUSES OF ACTION PROPERLY DISMISSED (SECOND DEPT).
No Showing Attorney Had Acquired Any Client Confidences Before Changing Firms

Categories

  • Abuse of Process
  • Account Stated
  • Accountant Malpractice
  • Administrative Law
  • Agency
  • Animal Law
  • Appeals
  • Arbitration
  • Architectural Malpractice
  • Associations
  • Attorneys
  • Banking Law
  • Bankruptcy
  • Battery
  • Chiropractor Malpractice
  • Civil Commitment
  • Civil Conspiracy
  • Civil Forfeiture
  • Civil Procedure
  • Civil Rights Law
  • Condominium Corporations
  • Condominiums
  • Constitutional Law
  • Consumer Law
  • Contempt
  • Contract Law
  • Conversion
  • Cooperatives
  • Copyright
  • Corporation Law
  • Correction Law
  • County Law
  • Court of Claims
  • Criminal Law
  • Debtor-Creditor
  • Defamation
  • Dental Malpractice
  • Disciplinary Hearings (Inmates)
  • Education-School Law
  • Election Law
  • Eminent Domain
  • Employment Law
  • Engineering Malpractice
  • Environmental Law
  • Equitable Recoupment
  • Evidence
  • Fair Credit Reporting Act
  • Fair Housing Act
  • Fair Housing Amendments Act
  • False Arrest
  • False Claims Act
  • False Imprisonment
  • Family Law
  • Federal Employers' Liability Act (FELA)
  • Fiduciary Duty
  • Foreclosure
  • Fraud
  • Freedom of Information Law (FOIL)
  • Human Rights Law
  • Immigration Law
  • Immunity
  • Indian Law
  • Insurance Law
  • Intellectual Property
  • Intentional Infliction of Emotional Distress
  • Involuntary Medical Treatment and Feeding (Inmates)
  • Judges
  • Labor Law
  • Labor Law-Construction Law
  • Land Use
  • Landlord-Tenant
  • Legal Malpractice
  • Lien Law
  • Limited Liability Company Law
  • Longshoreman's and Harbor Worker's Compensation Act
  • Malicious Prosecution
  • Maritime Law
  • Medicaid
  • Medical Malpractice
  • Mental Hygiene Law
  • Military Law
  • Money Had and Received
  • Municipal Law
  • Navigation Law
  • Negligence
  • Negligent Infliction of Emotional Distress
  • Negligent Misrepresentation
  • Notarial Misconduct
  • Nuisance
  • Partnership Law
  • Personal Property
  • Pharmacist Malpractice
  • Physician Patient Confidentiality
  • Pistol Permits
  • Prima Facie Tort
  • Private Nuisance
  • Privilege
  • Products Liability
  • Professional Malpractice
  • Public Authorities Law
  • Public Corporations
  • Public Health Law
  • Public Nuisance
  • Real Estate
  • Real Property Actions and Proceedings Law (RPAPL)
  • Real Property Law
  • Real Property Tax Law
  • Religion
  • Replevin
  • Retirement and Social Security Law
  • Securities
  • Sepulcher
  • Sex Offender Registration Act (SORA)
  • Social Services Law
  • Statutes
  • Tax Law
  • Tenant Harassment
  • Tortious Interference with Contract
  • Tortious Interference with Employment
  • Tortious Interference with Prospective Business Relations
  • Tortious Interference With Prospective Economic Advantage
  • Town Law
  • Toxic Torts
  • Trade Secrets
  • Trademarks
  • Trespass
  • Trespass to Chattels
  • Trusts and Estates
  • Uncategorized
  • Unemployment Insurance
  • Unfair Competition
  • Uniform Commercial Code
  • Usury
  • Utilities
  • Vehicle and Traffic Law
  • Victims of Gender-Motivated Violence Protection Law (VGM)
  • Village Law
  • Water Law
  • Workers' Compensation
  • Zoning

Sign Up for the Mailing List to Be Notified When the Site Is Updated.

  • This field is for validation purposes and should be left unchanged.

Copyright © 2026 New York Appellate Digest, Inc.
Site by CurlyHost | Privacy Policy

IN THIS ACTION BY A PROPERTY OWNER WHO LOST THE PROPERTY TO FORECLOSURE: (1)... IN THIS SLIP AND FALL CASE, STEPS WHICH DO NOT HAVE UNIFORM RISER HEIGHTS COULD...
Scroll to top