IN THIS LABOR LAW 240(1) ACTION, PLAINTIFF STEPPED ON A SMALL WOODEN “PATCH” COVERING A HOLE IN THE FLOOR AND HIS LEG WENT THROUGH THE HOLE; DEFENDANT’S ARGUMENT THE ACCIDENT WAS NOT FORESEEABLE WAS REJECTED; THE PRECISE NATURE OF THE ACCIDENT NEED NOT BE FORESEEN; IT IS ENOUGH PLAINTIFF WAS SUBJECTED TO AN ELEVATION-RELATION RISK AND NO SAFETY EQUIPMENT WAS PROVIDED (FIRST DEPT).
The First Department, reversing Supreme Court, determined plaintiff was entitled to summary judgment on his Labor Law 240(1) cause of action. Plaintiff was walking on a floor which had holes in it where mechanical equipment had been removed. When plaintiff stepped on a 12-inch by 12-inch “patch” which had been placed over a hole his leg went through and he was injured. The First Department rejected defendant’s argument that the incident was not foreseeable:
Plaintiff was working in the interstitial space, approximately eight feet from the 11th floor below, and was thus exposed to the effects of gravity. … [T]he affixing of “harnesses and safety lines attached to a safe structure” are the type of safety devices envisioned by § 240(1) to prevent a worker from falling through a collapsing floor … , which plaintiff was not provided.
… “A plaintiff in a case involving the collapse of a permanent structure must establish that the collapse was ‘foreseeable,’ not in a strict negligence sense, but in the sense of foreseeability of plaintiff’s exposure to an elevation-related risk”… . To establish foreseeability, “[a] plaintiff need not demonstrate that the precise manner in which the accident happened, or the injuries occurred was foreseeable; it is sufficient that [plaintiff] demonstrate that the risk of some injury from defendant’s conduct was foreseeable” … . This foreseeability analysis … applies to the partial collapse of a permanent structure … . Ciaurella v Trustees of Columbia Univ. in the City of N.Y., 2024 NY Slip Op 03455, First Dept 6-25-24
Practice Point; This is the second Labor Law 240(1) case in recent weeks involving the collapse of a permanent structure (a roof in the prior case and here a floor). In both cases the Appellate Division rejected the argument the accident was not foreseeable.