Civil Procedure, Engineering Malpractice, Negligence

CONTINUOUS REPRESENTATION DOCTRINE APPLIED TO AN ENGINEERING FIRM HIRED TO OVERSEE AN HVAC INSTALLATION PROJECT; THE THREE-YEAR NEGLIGENCE STATUTE OF LIMITATIONS WAS TOLLED BY THE CONTINUOUS REPRESENTATION DOCTRINE AND THE ACTION WAS TIMELY (FIRST DEPT).

The First Department determined the negligence action against Skyline, an engineering firm hired to inspect an on-going HVAC (heating, ventilation, air conditioning) installation, was not time-barred because the continuous representation doctrine applied to toll the accrual of the limitations period:

Plaintiff commenced this action in 2016 alleging that it retained Skyline, an engineering firm, to perform “special inspection” services for “Phase I” of an HVAC installation project, and that Skyline negligently performed those services and breached the contract. In support of its motion for summary judgment, Skyline demonstrated prima facie that it completed Phase I work under the contract in 2012 and that it was serving in a professional capacity as an engineering firm when it performed those services, so that the three-year limitations period applied (CPLR 214[6] … ). …

… [P]plaintiff demonstrated that the action is not time-barred because the continuous representation doctrine is applicable and tolled the accrual of the limitations period until 2014 … . Plaintiff submitted evidence showing Skyline provided special and progress inspection and testing services for “Remediation of Phase I” of the project, pursuant to a 2014 agreement. Although this work was completed under a separate agreement, Skyline rendered these services to correct the engineering and construction defects that it failed to identify during its Phase 1 inspection in 2012. Since Skyline continued to provide services in connection with Phase I in 2014, the action commenced in 2016 is timely under CPLR 214(6) … . Mutual Redevelopment Houses, Inc. v Skyline Eng’g, L.L.C, 2019 NY Slip Op 09112, First Dept 12-19-19

 

December 19, 2019
Tags: First Department
Share this entry
  • Share on WhatsApp
https://www.newyorkappellatedigest.com/wp-content/uploads/2018/03/NYAppelateLogo-White-1.png 0 0 Bruce Freeman https://www.newyorkappellatedigest.com/wp-content/uploads/2018/03/NYAppelateLogo-White-1.png Bruce Freeman2019-12-19 15:38:002020-01-24 05:48:20CONTINUOUS REPRESENTATION DOCTRINE APPLIED TO AN ENGINEERING FIRM HIRED TO OVERSEE AN HVAC INSTALLATION PROJECT; THE THREE-YEAR NEGLIGENCE STATUTE OF LIMITATIONS WAS TOLLED BY THE CONTINUOUS REPRESENTATION DOCTRINE AND THE ACTION WAS TIMELY (FIRST DEPT).
You might also like
PLAINTIFF’S BRINGING MULTIPLE MERITLESS LAWSUITS AGAINST DEFENDANT AND HER ATTORNEYS OVER THE COURSE OF TEN YEARS WARRANTED SANCTIONS (FIRST DEPT).
CONSPIRACY JURISDICTION DISCUSSED IN THIS COMPLEX LITIGATION INVOLVING MANY INTER-RELATED INTERNATIONAL CORPORATIONS AND ALLEGATIONS OF FRAUD.
NOT-FOR-PROFIT CORPORATION LAW PETITION TO DISINTER THE REMAINS OF ARCHBISHOP FULTON SHEEN AND MOVE THEM FROM ST PATRICK’S CATHEDRAL TO PEORIA ILLINOIS SHOULD NOT HAVE BEEN GRANTED WITHOUT A HEARING (FIRST DEPT).
PLAINTIFFS FELL FROM A LIFT TRUCK WHICH WAS STRUCK BY A BUS, SUMMARY JUDGMENT ON THE LABOR LAW 240 (1) CAUSE OF ACTION SHOULD HAVE BEEN GRANTED; HEARSAY ALONE WILL NOT DEFEAT A MOTION FOR SUMMARY JUDGMENT (FIRST DEPT).
MISDEMEANOR COMPLAINT DID NOT INCLUDE FACTS DEMONSTRATING THE ARREST OF DEFENDANT’S BROTHER WAS AUTHORIZED, THEREFORE THE COMPLAINT CHARGING DEFENDANT WITH RESISTING ARREST AND OBSTRUCTING GOVERNMENTAL ADMINISTRATION WAS JURISDICTIONALLY DEFECTIVE.
PLAINTIFF’S MOTION FOR SUMMARY JUDGMENT ON HIS LABOR LAW 240 (1) AND 241 (6) CAUSES OF ACTION SHOULD HAVE BEEN GRANTED, PLAINTIFF FELL OFF THE BACK OF A FLATBED TRUCK AS STEEL BEAMS WERE BEING HOISTED FROM THE TRUCK (FIRST DEPT).
Growling and Baring Teeth Insufficient to Raise Question of Fact About a Dog’s Vicious Propensities
IT WAS ERROR TO ALLOW IN EVIDENCE PHOTOGRAPHS OF A BAYONET WHICH WAS NOT THE WEAPON USED IN THE STABBING; THE MAJORITY FOUND THE ERROR HARMLESS, THE DISSENT DISAGREED (FIRST DEPT).

Categories

  • Abuse of Process
  • Account Stated
  • Accountant Malpractice
  • Administrative Law
  • Agency
  • Animal Law
  • Appeals
  • Arbitration
  • Architectural Malpractice
  • Associations
  • Attorneys
  • Banking Law
  • Bankruptcy
  • Battery
  • Chiropractor Malpractice
  • Civil Commitment
  • Civil Conspiracy
  • Civil Forfeiture
  • Civil Procedure
  • Civil Rights Law
  • Condominium Corporations
  • Condominiums
  • Constitutional Law
  • Consumer Law
  • Contempt
  • Contract Law
  • Conversion
  • Cooperatives
  • Copyright
  • Corporation Law
  • Correction Law
  • County Law
  • Court of Claims
  • Criminal Law
  • Debtor-Creditor
  • Defamation
  • Dental Malpractice
  • Disciplinary Hearings (Inmates)
  • Education-School Law
  • Election Law
  • Eminent Domain
  • Employment Law
  • Engineering Malpractice
  • Environmental Law
  • Equitable Recoupment
  • Evidence
  • Fair Credit Reporting Act
  • Fair Housing Act
  • Fair Housing Amendments Act
  • False Arrest
  • False Claims Act
  • False Imprisonment
  • Family Law
  • Federal Employers' Liability Act (FELA)
  • Fiduciary Duty
  • Foreclosure
  • Fraud
  • Freedom of Information Law (FOIL)
  • Human Rights Law
  • Immigration Law
  • Immunity
  • Indian Law
  • Insurance Law
  • Intellectual Property
  • Intentional Infliction of Emotional Distress
  • Involuntary Medical Treatment and Feeding (Inmates)
  • Judges
  • Labor Law
  • Labor Law-Construction Law
  • Land Use
  • Landlord-Tenant
  • Legal Malpractice
  • Lien Law
  • Limited Liability Company Law
  • Longshoreman's and Harbor Worker's Compensation Act
  • Malicious Prosecution
  • Maritime Law
  • Medicaid
  • Medical Malpractice
  • Mental Hygiene Law
  • Military Law
  • Money Had and Received
  • Municipal Law
  • Navigation Law
  • Negligence
  • Negligent Infliction of Emotional Distress
  • Negligent Misrepresentation
  • Notarial Misconduct
  • Nuisance
  • Partnership Law
  • Personal Property
  • Pharmacist Malpractice
  • Physician Patient Confidentiality
  • Pistol Permits
  • Prima Facie Tort
  • Private Nuisance
  • Privilege
  • Products Liability
  • Professional Malpractice
  • Public Authorities Law
  • Public Corporations
  • Public Health Law
  • Public Nuisance
  • Real Estate
  • Real Property Actions and Proceedings Law (RPAPL)
  • Real Property Law
  • Real Property Tax Law
  • Religion
  • Replevin
  • Retirement and Social Security Law
  • Securities
  • Sepulcher
  • Sex Offender Registration Act (SORA)
  • Social Services Law
  • Statutes
  • Tax Law
  • Tenant Harassment
  • Tortious Interference with Contract
  • Tortious Interference with Employment
  • Tortious Interference with Prospective Business Relations
  • Tortious Interference With Prospective Economic Advantage
  • Town Law
  • Toxic Torts
  • Trade Secrets
  • Trademarks
  • Trespass
  • Trespass to Chattels
  • Trusts and Estates
  • Uncategorized
  • Unemployment Insurance
  • Unfair Competition
  • Uniform Commercial Code
  • Usury
  • Utilities
  • Vehicle and Traffic Law
  • Victims of Gender-Motivated Violence Protection Law (VGM)
  • Village Law
  • Water Law
  • Workers' Compensation
  • Zoning

Sign Up for the Mailing List to Be Notified When the Site Is Updated.

  • This field is for validation purposes and should be left unchanged.

Copyright © 2026 New York Appellate Digest, Inc.
Site by CurlyHost | Privacy Policy

DEFENDANT DRIVER WAS ENTITLED TO SUMMARY JUDGMENT IN THIS BICYCLE-CAR TRAFFIC... FAILURE TO INFORM THE DEFENSE ABOUT A SECOND EYEWITNESS TO THE SHOOTING WAS...
Scroll to top