Town Planning Board’s Approval of the Installation of Wind Turbines Should Not Have Been Reversed—Board Properly Considered All the Factors Mandated by the Land Use Ordinance and Supreme Court Did Not Have the Authority to Substitute Its Judgment for the Board’s
The Third Department, reversing Supreme Court, determined that the town planning board had properly issued a special use permit for the installation of wind turbines. The court noted that the burden of proof on the owner for seeking a special exception (special use permit) is lower than the burden for seeking a variance. The court held that all of the analytical factors mandated by the land use ordinance had been properly considered by the board and Supreme Court did not have the authority to substitute its own judgment for the board’s:
The Land Use Ordinance permits specified uses in the area where the project is to be built and allows “[a]ll other uses” for which a special use permit is obtained. Contrary to petitioners’ assertion, while the project is not allowed as of right in the district, the fact that it is “permitted . . . is ‘tantamount to a legislative finding that [it] is in harmony with the general zoning plan and will not adversely affect the neighborhood'” … . As such, “the burden of proof on an owner seeking a special exception is lighter than that on an owner seeking a variance, [with] the former only being required to show compliance with any legislatively imposed conditions on an otherwise permitted use” … . The determination of the Board that those conditions had been met here will be upheld if it “has a rational basis and is supported by substantial evidence in the record” … .
The parties do not dispute upon this appeal, and we agree with Supreme Court, that the Board’s findings with regard to six of the eight conditions enumerated in the Land Use Ordinance are supported by substantial evidence. The first of the remaining two conditions requires that the “[l]ocation, use and size of structure, nature and intensity of operations involved, size of site in relation to it, and location of site with respect to existing or future streets giving access, are such that it will be in harmony with orderly development of the district.” The second requires that the “[l]ocation, nature and height of buildings, walls, fences and signs will not discourage the appropriate development and use of adjacent land and buildings or impair their value.”
With regard to those two conditions, the wind turbines are almost 500 feet tall when the rotor blades are fully vertical [FN2]. Notwithstanding their size, the Board pointed out that the turbines are located in an area where high-voltage electric transmission lines have already altered the landscape, and noted that other factors minimized the impact of the project upon the viewshed. The project will have minimal impact upon traffic after construction is completed and, given the economic benefits that will accrue to participating landowners, the Board found that it would help to preserve existing uses of the surrounding properties. Moreover, the Board cited a study in the record finding that property values would not be impacted by the project. The Board also pointed to proof that the applicant had entered into setback agreements with nonparticipating landowners who resided within 2,000 feet of the turbines, further ensuring that the project would not impair the use of nearby parcels or development in the zoning district. Supreme Court pointed to conflicting evidence submitted by petitioners with regard to both conditions but, even if that evidence was properly considered, “a court may not substitute its own judgment” where substantial evidence supports the determination of the Board … . Matter of Frigault v Town of Richfield Planning Bd., 2015 NY Slip Op 04355, 3rd Dept 5-21-15