Transmission Line from Hydroelectric Power Facility in Canada to Queens Properly Approved
The Third Department determined that the NYS Public Service Commission properly issued a certificate of environmental compatibility and public need (EC & PN) for an electric power transmission line running from a hydroelectric power facility in Canada to Queens. After the issuance of the EC & PN, the petitioners sought a rehearing pursuant to Public Service Law 22. The Commission denied the petition on the ground it had been filed and served one day late. The Third Department held that the failure to timely file was nonprejudicial “law office failure” which should have been excused pursuant to CPLR 2005 and went on to review the Commission’s grant of the EC & PN on the merits, including the economic feasibility of the plan, the public need for the hydropower-produced electricity (reduced carbon emissions), and the effects of the transmission line on the environment:
We begin by recognizing that, as parties to the proceedings at the agency level, petitioners have standing … . The criteria for authorizing the construction and operation of a major utility transmission facility are set forth in Public Service Law § 126. Under this statute, the Commission may not grant a certificate approving an electric transmission project unless it finds and determines (1) the need for the facility, (2) whether the facility will achieve the minimum adverse environmental impacts, (3) whether the facility will be located underground and comport with the state’s long-range plan to expand the electric power grid, (4) that there has been conformance with applicable state and local laws and regulations, and (5) that the facility promotes the public interest, convenience and necessity (see Public Service Law § 126 [1] [a]-[d], [f], [g]). This project involves the placement of a high voltage, direct current transmission line extending from the Canadian border to a converter station in Queens and, from there, a high voltage, alternating current transmission line to the Rainey Substation. The line will be placed underwater in Lake Champlain and the Hudson River and underground in the upland segments. * * *
Petitioners contend that the Commission failed to adequately consider the potential harm to aquatic species, including the endangered shortnose and atlantic sturgeon, posed by the placement of cables underwater. The plan requires the underwater cables to be buried at least six feet beneath the lake/river bottom, except in areas of utility crossings and hard rock. In these areas, the cable will be covered by concrete mats. The specific risks emanate from the use of the concrete mats as well as magnetic and electromagnetic field impact. The record supports the Commission’s determination that any risk has been minimized by the placement of the cable route utilizing existing habitat information designed to avoid significant coastal fish and wildlife habitat areas designated by the Department of State (see 19 NYCRR part 602) and the exclusion zones identified by the parties in the joint proposal. There is also expert record evidence supporting the Commission’s conclusion that the magnetic fields’ impact on sturgeon and other aquatic species would be minimal. Further, we agree with the Commission’s observation that the July 5, 2011 letter from the Army Corps of Engineers addressing the cable route under Lake Champlain and the Hudson River was a preliminary assessment. Moreover, the certificate is conditioned on the applicants’ procurement of a construction permit from the Army Corps of Engineers, which has jurisdiction over these navigable waterways, prior to commencing construction. Matter of Entergy Nuclear Power Mktg LLC v New York State Pub Serv Comm, 2014 NY Slip Op 07711, 3rd Dept 11-13-14